HMD recently launched two new vessels from Dry Dock No.1 for the first time since the dock's conversion into a new-building dock from a repair dock earlier this year.
Those two vessels are Hull No. 0306 and 0430, which were keel-layed on April 4. Hull No. 0306 is a 52,000-daw product/chemical carrier, the fourth of six vessels ordered by western petroleum.
Hull No.0430 is a 47,000-dwt product/chemical carrier, the last of six vessels ordered from OMI Corporation.
Hull Nos.0430 and 0306 are scheduled to be delivered in July and August, respectively.
|