
Loading Tank on Juice Carrier
HMD loaded 14 tanks including two 2,000 L tanks , twelve 1,000 L tanks on a 23,000 DWT juice carrier ordered by Atlanship on September 25.
The tank is one of the core facilities for the ship. It is designed with stainless steel cooling system to prevent contamination and heat insulation for temperature control. After all tanks were loaded, HMD finalized connecting pipes and launched the ship on October 15.
The ship measures 170.0 m long, 26.0 m wide, and 15.3 m deep. As this is the first juice carrier that HMD has built, the company trained workers in orbital welding and pipe welding.
Opens in new window
Move Forward With Innovation
Opens in new window
World's Leading Shipyard & Marine Engine Builder
Opens in new window
Aiming at Perfection in the Marine Industry
Opens in new window
Specialized Boiler Company with its Own CFBC Technology
Opens in new window
A Reliable Partner for Solar Energy Business
Opens in new window
Engineering Expert for Heavy Industry Sector