Press Releases

HVS completed the Sea Trial for the 1st PC Tanker

  • Author 관리자
  • Date 2014-04-17
  • Views 2974
Attachment
  • There are no attachments.

HVS completed the sea trial for the 1st product / chemical tanker on March 9.

The ship measures LOA 183m, 32m Beam and 19m depth.

The ship will be delivered to d'AMICO in May.

HMD supported the technical instructions and provided drawings and materials to build product / chemical tanker successfully in Vietnam.

 

HVS had a steel cutting ceremony in May, 2013, commenced fabrication at No.2 drydock in September, and was launched in December.

HMD Quick Links